The 12th International Show of Construction Equipment and Technologies 2011 has been grandly held at the exhibition hall of CROCUS
On June 23rd–24th, Foton Lovol 2011 Euro-African Regional Business Meeting has been grandly held in Istanbul。
Following the appearance in the prime time of CCTV last year。
Successful Hoisting of Largest-tonnage Domestically-produced Crawler Crane On the morning of June 28, with the fluttering flags。
On May 31, the 2011 CTT was kicked off in Moscow。
In 2010 SUNWARD launched its SWSD series of CAP (Cased Auger Pile) followed specially with DTH hammer technology for the execution
On the press release of HIGHSPEED 2010, He Huawu。
As a great move of XCMG globalization strategy, the investment signing ceremony was held in Pouso City, MG State 。
Recently, accompanied by Director of Department of Latin American and Caribbean Affairs。
International Construction Machinery Exhibition in Russia (CTT for short)will be held from 31 of May to 4 of June in Moscow. The e
The “Global Engineering Machinery Manufacturers Top 50 List” released by the China Engineering Machinery magazine。
In order to adapt to the market requirement。
CeMAT 2011, the world's leading fair for intralogistics, got under way on May 2nd, in Hanover exhibition centre。
Recently, XCMG Import & Export Co., Ltd has successfully exported 110 sets of equipment including truck crane, loader。
Beginning from this year, XCMG has tried its best to seize market。
In March, echoing the target of taking prime time to set new sales volume raised by XCMG。
At 6:00 pm on 29th June, a SWE17B excavator with provisional license plate appeared, the waiting cro
May 29 ~ June 2, the M&T EXPO was held at Immigrants Exhibition Center in St. Paul, Brazil. During the exhibition, Shandong Lingong exh
On November 7, the opening ceremony for Phase III Training of XCMG Public Welfare Project -- "Global Excellent Operator" was held in XCMG, where Li Ge, the Deputy Secreta
What is breaking force deficiency? It is when you press the brake pedal down, the loader does not slow down or stop as required. The main causes include: ① The brake system i
Copyright Notice 2002-2025 cmsou.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China